Joint Sealing in Tunnel Constructions

1 Pump
KÖSTER Acrylic Gel Pump
2 Special sealing system

3 Injection needle

4 Joint sealant
KÖSTER Injection Gel S4
5 Joint protection
KÖSTER PU-Flex 25

The complex construction of tunnels entails great challenges for the waterproofing system. Even with the highest application standards there could be special situation or extraordinary occurrences that could cause leaks inside the tunnels. These leaks are mostly located along the joints of the tubbing elements, and if not treated in time, could cause severe damages to the structural integrity of the tunnel.

The KÖSTER Injection Gel S4 with the B+ component is a specially designed acrylic gel for the injection of joints providing an outstanding elasticity, a higher adhesion to the flanks, and a reduced drying tendency when in contact with moving air such as wind. The reaction time adjustable acrylic gel is injected inside the joint using injection needles inserted through a special sealing system placed in the joint. To avoid material loses on the back and prevent the material from running down the drainage system, a backing rod is inserted to create a defined injection area.

When the injection is completed, the special sealing system can be removed and the gel protected with the PU sealant KÖSTER PU-Flex 25.

Always adhere to the specifications in the respective Technical Guidelines.

 

Back

Top
Austria Bosnia and Herzegovina Brasil Bulgaria China Croatia Denmark Finland Germany Ghana Greece Hungary Italy Japan Kazakhstan Korea Kuwait Latvia Lebanon Mexico Netherlands Norway Panama Philippines Poland Portugal Romania Russia Senegal Serbia Slovakia Slovenia South Africa Spain Thailand Turkey Ukraine United Kingdom United States of America